This gadget provides a way to see the status of all the Test Runs of a group of Test Executions.

Purpose

This gadget enables you to see which Tests were or are going to be executed, along with their corresponding results.

Possible usage scenarios:

How to use


The performance of this gadget can be optimized in the Miscellaneous section of the Xray Administration, by setting specific limits to the number of Test Runs (set to 2000 by default).

Select and filter Test Execution issues with:

It is also possible to configure the: