The Test Plan List

Purpose

The Test Plans List Report shows a list of Test Plan issues and their corresponding consolidated execution status. The status is shown as a progress bar with the consolidated status (e.g., typically the latest test run status) from each Test issue that is part of that Test Plan.

Possible usage scenarios:

  • analyze the progress of each Test Plan
  • see the planned Test Plans for some version and get an overview of the progress of each one of them

How to Use

This report is accessible either from the Xray icon on the project left sidebar or from the standard Reports icon, which includes other kinds of reports besides Xray. 

Source Test Plan issues can be directly provided using a advanced filter or by specifying some Test Plan-related fields:

  • Advanced: a JQL query to filter the coverable issues
  • Basic:
    • Project: project
    • Assignee: the issue's assignee
    • Component: the component assigned to the issue
    • Fix Versions: versions assigned to the issue
    • Resolution: the workflow resolution
    • Status: the workflow status
    • Contains: the full issue key or part of the summary

  • A: Filter, for selecting the source data
  • B: visualization information and options



Columns

Aside from the available custom fields for Test Plan issues, there are some special columns that can be included:


Metric

Notes

Begin DatePlanned begin date for the Test Plan
End DatePlanned end date for the Test Plan
StatusThe progress (i.e., the overall execution status of the Test Plan)

Example

The report may be a bit wide for some screen resolutions so you will need to scroll horizontally to see the rest of the information.

Some values provide a link, so you can be redirected to the respective entities.


Export and Share

The report can be exported to a CSV file, which will export up to 1000 issues and not just the visible ones.

Click on Export and select To csv.


 