Defects directly associated with the related Test Runs (i.e., that were created within the context of Test Executions of a given Test Plan). Will count unique Defects (i.e., if the same Defect issue is added multiple times in the same Test Run or added multiple times within Test Runs within the same Test Plan, it will count as one)

Defects with Resolution will be counted in the Closed column; all others will be counted in the Open column.
UI Steps
UI Step

The Plan Report

Image RemovedImage Added

UI Step

Purpose

This report allows shows some relevant metrics about that enable you to evaluate a Test Plan and eventually compare it with others.

Possible usage scenarios:

  • analyze both the progress of the Test Plan and its success rate (i.e., the % of Tests contributing to the requirement's OK status)
  • analyze the success rate by Test Environment
  • see the number of manual Tests vs. others in the Test Plan
  • see the overall execution status (i.e., the latest status of the Tests of the Test Plan)
  • see the number of linked defects opened/closed, in the context of the Test Plan

    The Test Plans List Report shows a list of Test Plan issues and their corresponding consolidated execution status. The status is shown as a progress bar with the consolidated status (e.g., typically the latest test run status) from each Test issue that is part of that Test Plan.

    Possible usage scenarios:

    • analyze the progress of each Test Plan
    • see the planned Test Plans for some version and get an overview of the progress of each one of them
    UI Step

    How to Use

    This report is accessible either from the Xray

    Reports icon

     icon on the project left sidebar or from the standard Reports icon, which includes other kinds of reports besides Xray. 

    At the top of the report you'll find two areas related with the report and with the data shown in the report.

    Image Removed

    • A: Filter, for selecting the source data
    • B: visualization information and options
    UI Step
    Defining Scope

    Source Test Plan issues can be directly provided

    (within section A)

    using a

    saved

    advanced filter or by specifying some Test Plan-related fields:

    Saved filter
    • Advanced: a
    saved filter containing Test Plan issues
    Fix Version: the version assigned to the Test Plan
    • JQL query to filter the coverable issues
    • Basic:
      • Project: project
      • Assignee: the
    Test Plan
      • issue's assignee
    Status: the workflow status
      • Component: the component assigned to the issue
      • Fix Versions: versions assigned to the issue
      • Resolution: the workflow resolution

    Image Removed

      • Status: the workflow status
      • Contains: the full issue key or part of the summary

    Image Added

    • A: Filter, for selecting the source data
    • B: visualization information and options

    Image Added



    % of "successful" Tests
    UI Step

    Columns

    Aside from the available custom fields for Test Plan issues, there are some special columns that can be included:


    Metric

    Notes

    Begin DatePlanned begin date for the Test Plan
    End DatePlanned end date for the Test Plan
    StatusThe progress
    UI Step

    Metrics

    MetricNotes

    total test executions

    Number of Test Executions related with this Test Plan

    total test runs

    Total number of Test Runs from all related Test Executions

    total tests

    Number of Tests being tracked by the Test Plan

    number of tests by status

    Number of Test Plan's Tests, per latest status

    number of tests by test type

    Number of Test Plan's Tests, per Test Type

    progress

    Overall progress; % of Tests with a final status

    success rate

    % of "successful" Tests (i.e., whose latest status contributes to the OK requirement status; the PASS Test Run status is an example of such a status)

    success rate by Test Environment

    (i.e.,
    whose latest status contributes to the OK requirement status), per Test Environment
    linked defects (open/closed)
    the overall execution status of the Test Plan)
    UI Step

    Example

    Image RemovedImage Added

    The report may be a bit wide for some screen resolutions so you will need to scroll horizontally to see the rest of the information.

    Some values provide a link, so you can be redirected to the respective entities.


    UI Step

    Export and Share

    The report can be exported to a CSV file, which will

    include all report rows (

    export up to 1000 issues and not just the visible ones

    )

    .

    Click on Export

     and

     and select To csv.

     


     Image Added

     Image Removed

    The report can be shared by copying and sending the URL located in the browser's address bar.

    When opening the report the Filter will be automatically populated with the values provided in the URL.